Turf surface · 50 MM pile
Surface 01 / 05 · Performance turf
Football turf.
FIFA Quality Pro systems from 12,000 to 18,000 dtex, mill-direct from Bellinturf and CCGrass, laid on a base we build ourselves.




Pick your grade.
Dtex is the weight of the grass yarn. A heavier yarn lasts longer under studs. Pick by how many hours a week the ground will be used, not by the biggest number.
Turf surface · 50 MM pile
Turf surface · 50 MM pileDiamond
Bellinturf View page →
Turf surface · 50 MM pilePrime CM
CCGrass View page →White Turf
A pure all-white pile made mainly for line marking, the lines, boundaries and key zones set into the green field. Tufted in, not painted, so the markings stay crisp and never need repainting.
Turf surface · 50 MM pileStrength
Bellinturf View page →
Turf surface · 50 MM pileBellin-Stem
Bellinturf View page →
Turf surface · 50 MM pileStrength-Pro
Bellinturf View page →
Turf surface · 50 MM pilePioneer
Bellinturf View page →
Turf surface · 50 MM pileLibra
CCGrass View page →
Turf surface · 50 MM pile · FlagshipLegend
View page →
Turf surface · 30 MM low-pileNon-Infill
Bellinturf
Turf surface · 40 MM mid-pileNon-Infill
Bellinturf
Turf surface · 30 MM whiteWhite Non-Infill
Bellinturf
Turf surface · 30 MM low-pileNon-Infill Lite
BellinturfWhich one is yours?
Light to medium daily use. Cost-conscious build, dependable feel.
12K · Stem Pro, Diamond →Daily training, weekly matches. Built to outlast a generation of students.
14K Strength · 16K Pioneer →Full-contact, full-season. Cameras on, sliding tackles, visiting referees.
16K Strength-Pro · 18K Legend →Base to line marking, one partner.
A surface is only as good as what it sits on. ILAN builds the base, lays the turf and marks the lines, so one team owns the levels, the drainage and the result.
Cut to formation level, proof-rolled, graded to the designed falls (0.5–1%) so water leaves the field, never pools on it.
Granular sub-base (GSB) 150–200 mm and wet-mix macadam (WMM) 100–150 mm, compacted in layers and tested for density.
Dense asphalt 40–50 mm or PCC, laid to a 3 mm over 3 m flatness tolerance, with shock pad where the system calls for it.
Perimeter drains, catch pits and kerbing, so the surface stays dry and the edges hold for years.
The details.
Budgeting? Read the 2026 cost guide, run the cost calculator, or see the turf business payback maths.
Want the whole ground built? See turnkey football turf construction, base to line marking, and how a pitch goes down, step by step.
What comes in the install kit
12 KG glue + 1.2 KG hardener · 90:10 mix · 60-min pot life
0.3 M × 100 M roll
Engineered grain · for non-infill systems · 1.4 KG / SQFT
10 M × 30 M roll · braided / knotless / twisted variants
Keeping a pitch playable
Clear leaves and litter. Debris trapped in infill holds moisture and shortens fibre life.
Drag-brush the full field to redistribute infill and lift the pile. This is the single most valuable thing you can do to a football pitch.
Check infill depth across the field, goalmouths and centre circle lose it fastest, and top up. Decompact high-traffic zones.
A deep-clean and decompaction pass, plus a seam and line-marking inspection before the season.
Questions, asked often
How long does a football turf pitch last?
What is dtex, and does a higher number mean better?
Infill or non-infill, which do we need?
Do you supply FIFA-certified systems?
Can it be laid on our existing ground?
How does it handle monsoon?
What is the difference between your 12k, 14k, 16k and 18k ranges?
Do you handle line marking and goals?
The rest of the ILAN range.
One partner for every surface, sports turf, courts, tracks, landscape grass and the netting that finishes a ground.