Built for daily play.
For a generation.

A school ground takes the worst use of any sports surface in Indiaseven hours a day, six days a week, 200 days a year. Across football, cricket, kabaddi, kho-kho, basketball and PE. We pick surfaces that survive the schedule, not the sales brochure.

8–10YR
Typical lifespan
7HRS
Daily use
5SPORTS
Per ground
90+
Schools served
SCH
Base construction included
Excavation, compacted sub-base, drainage and the finished asphalt or concrete base are built by ILAN, then the surface goes on top. One scope, one team, one price.
FOOTBALL · CRICKET · BASKETBALL · BADMINTON · KABADDI

Why school grounds are different

One ground.
Five sports.
Eight years.

A school doesn't have one football pitch and one cricket strip, it has one ground that has to be all of them. PE on Monday, inter-house football on Tuesday, the cricket coach on Wednesday, kabaddi in the evening, parents' day basketball on Saturday.

We design school recommendations around that reality: multi-sport pile that takes punishment, line markings that don't fight each other, and a budget that survives the procurement cycle.

Why schools choose us.

Six concrete things that matter for a school sports ground, written for principals and procurement officers, not athletes.

/ 01

Daily-wear durability

The 14K and 16K DTEX tiers were built precisely for repeated sub-200-day cycles. School-grade isn't an excuse for cheap, it's a different brief.

/ 02

Multi-sport on one ground

Football outer + basketball overlay + badminton lines on one surface. Our 15mm multi-sport range is built for exactly this.

/ 03

Lower long-term cost

A ₹50/sqft surface that lasts 8 years beats a ₹35/sqft surface that needs replacing in 4. We do the math with you up front.

/ 04

Safety-first specs

Shock absorption, tested anti-skid, no sharp edges, no toxic infill. Datasheets we'll happily share with your parents' committee.

/ 05

Low-maintenance design

Non-infill or light-infill options. A weekly broom-down, a monthly inspection. That's it. No specialised crew needed.

/ 06

Pan-India delivery

From CBSE schools in tier-2 cities to international campuses in metros, we deliver. 5–10 day lead times, anywhere in India.

Recommended surfaces.

Most schools fall into one of these brackets. Each gets a different surface recommendation, picked for usage intensity and budget reality, not aesthetics.

Primary / 01

Primary school

Up to 500 students. Mixed-use playground, small football area, hopscotch, basic running.

Recommended
12K Stem Pro · 25mm
  • Foundation tier 12K DTEX, durable enough for daily play
  • Shorter 25mm pile, kids fall on it, less scrape
  • 6–8 year lifespan with light maintenance
  • Budget band: ₹3–5L for 4,000–6,000 sqft
Secondary / 02

Secondary & CBSE

500–2000 students. Football, cricket, basketball, kabaddi all on one ground. The most common Indian school spec.

Recommended
15mm Multi-sport
  • 15mm multi-sport pile, handles 5+ sports cleanly
  • Multi-line markings: football + basketball + badminton
  • 8–10 year lifespan with monthly maintenance
  • Budget band: ₹8–15L for 8,000–15,000 sqft
International / 03

International K-12

2000+ students. Dedicated football pitch, cricket nets, and a separate multi-sport court, often with a stadium-grade brief.

Recommended
16K Strength + 9mm Cricket + 15mm Multi
  • 16K DTEX football pitch for tournament-grade play
  • 9mm cricket pitch for true bounce in nets & matches
  • Separate multi-sport court for basketball & tennis
  • Budget band: ₹40–80L for the full facility

Typical profile.

Aggregate numbers from the 90+ school grounds we've supplied. Yours will vary, but these are the bands.

Area
4–15K SQFT

Most school grounds fall in this band, small playground to mid-sized multi-sport facility.

Budget
₹3–15L

Surface only. Sub-base prep, fencing, line-marking budgets sit on top, typically 30–50% of surface cost.

Lifespan
8–10YR

With weekly broom-downs and monthly inspections. Stadium-grade tiers run longer.

Timeline
3–6WK

From confirmed order to opening day. Sub-base prep adds 1–2 weeks if it's not already in.

School references.

Cricket · Twin nets '24

Bengaluru · Karnataka

Inventure Academy

Twin practice strips for the school's senior cricket programme. ICC-friendly weave, indoor net cage with monsoon-proof drainage.

Surface9mm Cricket
Area1,290 sqft
Multi-sport · 4 games '24

Pune · Maharashtra

Symbiosis Vishwabhavan

Multi-sport rooftop court, basketball, tennis, futsal, and PE all painted on a single 15mm pile. The total-utility playbook.

Surface15mm Multi
Area8,720 sqft
Football · Full pitch '23

Hyderabad · Telangana

Oakridge International

Tournament-grade pitch for the school's senior football programme. 16K DTEX, FIFA-compliant. Hosts inter-school finals.

Surface16K DTEX
Area34,200 sqft
SPECIFIER'S CHECKLIST FOR SCHOOLS SUB-BASE CONDITION USAGE INTENSITY · HOURS SPORTS LIST & PRIORITY DRAINAGE PLAN FENCING HEIGHT REQ. LINE-MARKING PRIORITY LIGHTING REQUIREMENT DTEX TIER DECISION PILE HEIGHT CHOICE INFILL TYPE MAINTENANCE PLAN WARRANTY & AFTER-SALES ILANINDIA.COM · 2026

Free download · 12 pages.

The 12 questions to answer before you sign off on a school sports surface. Print it, walk the ground, tick the boxes, bring it to the quote meeting.

  • Sub-base & drainage assessment
  • Usage intensity & sports priority
  • DTEX, pile and infill decision tree
  • Maintenance & after-sales planning

Instant download · No spam · Unsubscribe anytime

Specific to schools.

With a 15mm multi-sport pile and overlaid line markings. The football outer plays as the base. Basketball lines go inside in white, badminton/tennis in yellow, kabaddi in a contrasting accent. Lines are tufted-in or painted with a UV-resistant marking system, both last 5+ years.
Yes, synthetic turf is more monsoon-resilient than natural grass or concrete. The PU backing has perforated drainage. As long as the sub-base has a 1–2% slope and a basic drain channel, water clears in minutes. We've delivered to Mumbai, Cochin, and Guwahati schools with no monsoon issues.
For primary schools we recommend non-infill or sand-only infill, both are inert, washable, and parent-committee-friendly. For secondary schools that need rubber granules for shock absorption, we use only SBR or EPDM virgin rubber, never reclaimed tyres. All infills are VOC-tested. Lab reports available.
Minimal. Weekly: a 30-min broom-down to redistribute infill. Monthly: a visual inspection, seams, drainage, line clarity. Annually: a deep clean and infill top-up. No specialised equipment. No chemicals. Most schools use the existing maintenance staff with a half-day training from us.
Yes, and that's how most school installs are scheduled. Average install on a 8,000 sqft ground takes 2–3 weeks, including sub-base prep. We can have a full pitch ready by the time school reopens. Order finalisation needs to be 4–6 weeks before for stock to arrive in time.
We don't carry headline "school pricing", but we quote schools the same trade-tier pricing as our authorised dealers, which is meaningfully below MSRP. For multi-ground projects (e.g. a chain of schools across cities), we can structure additional volume terms. Tell us the project; we'll come back with the right number.

Tell us your school.

A free site visit, surface recommendation and budget estimate. No obligation, no pushy follow-ups. Most schools we quote come back to us within the same procurement cycle.