Most surface failures start underneath. A carpet laid on a bad base fails in the first monsoon and nobody can say whose fault it was. So we build the base ourselves, to falls, with drainage designed for the city, and we take responsibility for the whole ground.
What turnkey covers.
| Stage | What we do |
|---|---|
| Survey | Levels, falls, existing base, drainage path, access |
| Excavation and grading | Cut to formation, proof-rolled, graded to 0.5 to 1 percent falls |
| Sub-base | Compacted aggregate, graded stone, blinding layer |
| Drainage | Perimeter or herringbone drains sized for the local monsoon |
| Edging | Concrete kerb to hold the carpet and the infill |
| Surface | Turf, seams, infill, brushed in |
| Marking | Inlaid lines in contrasting yarn, not painted |
| Fencing and lights | Galvanised posts, Garware netting, LED on poles or masts |
| Handover | Surface checked, lines verified, care brief |
Formats and timelines.
| Format | Area | All-in, 2026 | On site |
|---|---|---|---|
| 5-a-side | 6,000 to 10,000 sq ft | ₹16 to ₹31 lakh | 2 weeks |
| 7-a-side | 12,000 to 16,000 sq ft | ₹28 to ₹46 lakh | 3 weeks |
| Full pitch | 75,000 to 90,000 sq ft | ₹1.4 crore up | 5 to 7 weeks |
Line by line in the cost guide; a number for your size from the calculator.
How it works.
- Tell us the ground. Area, sport, city, and what it has to survive. The Field Designer gives you a drawing and a roll plan.
- Site visit. Levels, falls, drainage, base.
- Quotation in 48 hours. One number: base, supply, installation, marking, with the data sheet.
- Build and handover. Crews stay until the lines are down and the care brief is in your hands.
Questions, asked often.
Do you build the base or only lay turf?
Both, and we prefer to build the base. Where a client already has a sound, level base with falls we inspect it and lay on it.
What turf goes on the ground?
FIFA Quality or Quality Pro systems from 12K to 18K dtex, chosen by how hard the ground will be played. See the range.
Can I get a quotation without a site visit?
For supply-only orders, yes: send dimensions and the tier and we quote the same day. For turnkey work we visit first; the base and drainage cannot be priced from photographs.
Where are you based and where do you deliver?
Warehouse and design office in Surat, Gujarat. Turf ships by road to every state; same day in Surat, next day to Ahmedabad and Mumbai, two to six days elsewhere. See where we build.
Got a ground?
Site visit, spec sheet and a turnkey quotation in 48 hours.