Two systems, one geometry. A 400 m track is 176.9 by 92.5 metres with eight 1.22 m lanes, whatever it is surfaced with. The choice is between a spray-coat system, a 10 mm SBR base with a 3 mm EPDM wear layer, and a full polyurethane system for competition venues. We build both on an asphalt base laid to tolerance.
What turnkey covers.
| Stage | What we do |
|---|---|
| Survey and geometry | Track set out to standard 400 m geometry with the Track Designer |
| Base | Compacted aggregate, two-layer asphalt to planarity tolerance |
| Rubber layers | Spray coat: 10 mm SBR + 3 mm EPDM. Full PU: poured polyurethane with EPDM |
| Lane marking | Eight lanes at 1.22 m, start and finish lines, staggers, exchange zones |
| Infield | Football pitch or natural grass, drained together with the track |
| Certification | Field test support where the venue requires it |
School tracks and short loops.
Not every campus has space for a full oval. We build 200 m tracks, straight 100 m sprint lanes and jogging loops around existing grounds in the same EPDM systems. Colours: terracotta and blue as standard. Lay out yours with the Track Designer; specification on the running track page.
How it works.
- Tell us the ground. Area, sport, city, and what it has to survive. The Field Designer gives you a drawing and a roll plan.
- Site visit. Levels, falls, drainage, base.
- Quotation in 48 hours. One number: base, supply, installation, marking, with the data sheet.
- Build and handover. Crews stay until the lines are down and the care brief is in your hands.
Questions, asked often.
Spray coat or full PU?
Spray coat for schools, universities and training. Full PU for competition venues and stadiums. Both are IAAF-recognised system types; the difference is durability under spikes and the finish.
How long does a track take?
Eight to twelve weeks for a full oval, most of it base and asphalt. The rubber layers themselves take two to three weeks of dry weather.
Where are you based and where do you deliver?
Warehouse and design office in Surat, Gujarat. Turf ships by road to every state; same day in Surat, next day to Ahmedabad and Mumbai, two to six days elsewhere. See where we build.
Got a ground?