One partner for the whole ground. Schools, universities, clubs and townships rarely need one surface. They need a football pitch, two cricket nets, a tennis court, a running track and a lawn, and they want one team accountable for all of it. That is what we supply and build.
The surfaces.
| Surface | System | Page |
|---|---|---|
| Football turf | 12K to 18K dtex, FIFA Quality and Quality Pro, 50 mm; 30 mm non-infill | Football |
| Box cricket and hybrid | 35 mm hybrid turf, cricket-first bounce | Hybrid |
| Cricket pitches and nets | 9 mm cricket turf, Garware netting | Cricket |
| Hockey | FIH Global 13 mm water-based, FIH National 18 mm sand-dressed | Hockey |
| Tennis | ITF Category 5 sand-filled turf, three colours | Tennis |
| Padel | Classic, Panoramic, Ultra Panoramic; 12 mm glass, LED | Padel |
| Multi-sport | 15 mm turf for football, cricket, volleyball, kabaddi | Multi-sport |
| EPDM | Running tracks, playgrounds, basketball and volleyball courts | EPDM |
| Landscape | 20 to 60 mm artificial grass | Artificial grass |
Why one supplier.
Because the base under a football pitch and the base under a tennis court are designed by the same person, drained into the same system, and built by the same crew in one mobilisation. Because a quotation with one number and one warranty is easier to sign than five. And because when something needs fixing in year three there is no argument about whose scope it was.
How it works.
- Tell us the ground. Area, sport, city, and what it has to survive. The Field Designer gives you a drawing and a roll plan.
- Site visit. Levels, falls, drainage, base.
- Quotation in 48 hours. One number: base, supply, installation, marking, with the data sheet.
- Build and handover. Crews stay until the lines are down and the care brief is in your hands.
Planning a whole campus? The Complex Designer lays out every surface on one site plan with live areas per material.
Questions, asked often.
Do you handle the civil work?
Yes. Base construction, drainage, fencing, lighting and line marking are in scope. Buildings and pools are by others.
Can you phase a large campus?
Yes. Most universities build the football pitch and tennis courts first and add the track and hockey pitch in a second phase. We design the drainage for the final layout from day one.
Where are you based and where do you deliver?
Warehouse and design office in Surat, Gujarat. Turf ships by road to every state; same day in Surat, next day to Ahmedabad and Mumbai, two to six days elsewhere. See where we build.
Got a ground?
Site visit, spec sheet and a turnkey quotation in 48 hours.


