Our most premium grass, the highest DTEX and density for a plush, luxurious finish. An ultra-natural look with maximum comfort underfoot, made for showcase spaces and interiors.
Luxury comfort, premium feel.

25mm4 Layer Backing
35mm4 Layer Backing
40mm4 Layer Backing
45mm4 Layer Backing
50mm4 Layer Backing
60mm4 Layer BackingOne partner for every surface, sports turf, courts, tracks, landscape grass and the netting that finishes a ground.
/ The heights
Closest to vertical, fastest to recover, least likely to show footfall. Specified where a luxury hand-feel is wanted but the surface still gets crossed daily, walkways, balconies, family lawns, showroom floors.
Visibly fuller from standing height, deep enough to sink into at 45 mm. Best in spaces that are used rather than transited, seating lawns rather than through-routes.
Density steps up to 18,900 here, more yarn per square metre to support the extra height. The height specified for hospitality and showcase landscaping.
The deepest pile we supply, at 20,900 density. A statement surface for feature lawns, resorts and display builds, not for daily circulation.
All three ILAN landscape collections share UV-stabilised yarn and a perforated free-draining backing. Yarn weight, density and backing build are what separate them.
| Collection | Tier | DTEX | Density / Stitch | Heights (mm) | Backing |
|---|---|---|---|---|---|
| Ultra Soft | Luxury | 7300 | 14,900 – 20,900 | 25 · 35 · 40 · 45 · 50 · 60 | 4 Layer |
| UltraPro | Super High Density | 7300 | 24 st /10 cm | 35 · 40 · 45 | 4 Layer |
| Pure Green | Signature | 6300 | 14,900 | 35 · 40 | 4 Layer |
| Evergreen | Essential | 6000 | 13,900 – 14,900 | 20 · 25 · 35 · 40 · 50 | Single / Double |
ILAN supplies and installs. This is the sequence a landscape grass project follows on site.
Site measure
We measure the area, check falls and drainage, and look at what the grass is going onto, soil, concrete, tile or deck. Roll direction is planned here: all pile on a job runs the same way, or joints read as colour changes.
Base check
We build the base where the site needs one: excavation, compacted stone base, drainage and edging, checked for level and falls. Over existing concrete, tile or other hard surfaces we check the surface and falls instead.
Edge restraint
Perimeter edging is fixed so the grass has something to be secured and trimmed against, timber, aluminium or the existing hard edge.
Laying and acclimatising
Rolls are set out and left to relax so the backing loses roll memory before it is cut and joined.
Jointing
Seams joined on jointing tape with adhesive, pile direction matched across the joint. Done properly a joint is invisible from standing height.
Trimming and fixing
Edges cut to the perimeter and fixed down, following the edging so the finish reads deliberate.
Infill and brushing
Ballast spread where the specification calls for it, then the pile power-brushed upright. Brushing is what makes a new lawn look finished rather than flat.
Landscape grass replaces mowing, watering and seasonal patching. What little it needs takes minutes.
Brush or sweep the pile upright on the routes that get walked most, and clear leaves before they mat down.
Rinse with water to clear dust. The perforated backing drains freely, so washing carries dust through rather than pooling it.
Check infill where it was specified and top up. Inspect seams and edges for lifting, especially after monsoon.
Spot-clean spills with mild soap and water. Pet areas rinse clean. Localised damage is repaired by cutting in a patch rather than relaying.
Base construction · Landscape systems
A surface is only as good as what it sits on. ILAN now builds the base as part of the project, so one team owns levels, drainage, tolerances and the surface on top. Layer thicknesses are finalised after our site survey and soil check.
Topsoil and vegetation removed, 75–100 mm deep, formation trimmed to a gentle fall.
Compacted crushed stone 50–75 mm with a fine grit blinding for a smooth, free-draining bed.
Timber, paver or concrete edging so the grass has a firm line to finish against.
On concrete, tile or podium decks, no excavation: we clean, check falls and lay directly.
Base, surface and marking · one scope · one price
Every series, height, DTEX and density in one PDF, plus backing and feature details. Or message us with your space and we'll recommend the right grass.